Simple an fast installation
The installation of the SkyProof System is very simple and intuitive, comprising 4 main phases.
1. FIRST FASE
The initial phase involves aligning the first sheet according to the direction indicated by the executive design of the roofing system.
2. SECOND FASE
The brackets are then secured along the first edge rib, using the sheet itself for proper alignment.
3. THIRD FASE
The next phase includes inserting polyamide brackets along the second rib of the Skyproof sheet and securing them to the rafters that make up the supporting substructure.
4. FOURTH FASE
Once the first SkyProof sheet is aligned and anchored, the installation of the subsequent sheet can proceed by engaging its rib onto that of the “starting” sheet, exerting pressure along the overlapping line. From this point onward, the installation progresses sequentially, repeating the previously described operations.